English
Language : 

HC4GX15 Datasheet, PDF (605/668 Pages) Altera Corporation – HardCopy IV Device Handbook
Chapter 2: HardCopy IV GX Dynamic Reconfiguration
Functional Simulation of the Offset Cancellation Process
2–147
Functional Simulation of the Offset Cancellation Process
This section contains the points to be considered during the functional simulation of
the dynamic reconfiguration process.
You must connect the ALTGX_RECONFIG instance to the ALTGX_instance/ALTGX
instances in your design for functional simulation. The functional simulation uses a
reduced timing model of the dynamic reconfiguration controller. Therefore, the
duration of the dynamic reconfiguration process is 16 reconfig_clk clock cycles for
functional simulation only. The gxb_powerdown signal must not be asserted during
the offset cancellation sequence (for functional simulation and silicon).
Document Revision History
Table 2–43 shows the revision history for this chapter.
Table 2–43. Document Revision History
Date and Document Version
June 2009, v1.0
Initial release.
Changes Made
Summary of Changes
—
© June 2009 Altera Corporation
HardCopy IV Device Handbook, Volume 3