English
Language : 

HC4GX15 Datasheet, PDF (604/668 Pages) Altera Corporation – HardCopy IV Device Handbook
2–146
Chapter 2: HardCopy IV GX Dynamic Reconfiguration
Dynamic Reconfiguration Duration and Core Fabric Resource Utilization
Table 2–42. Dynamic Reconfiguration Duration for Transceiver Channel and CMU PLL
Reconfiguration (Part 2 of 2)
Transceiver Portion Under Reconfiguration
Transmitter and receiver channel reconfiguration
CMU PLL only reconfiguration
Transmitter channel and CMU PLL reconfiguration
Transceiver channel and CMU PLL reconfiguration
Number of reconfig_clk Clock Cycles
6861 clock cycles
970 clock cycles
2650 clock cycles
7850 clock cycles
Dynamic Reconfiguration (ALTGX_RECONFIG Instance) Resource Utilization
You can observe the resources utilized during dynamic reconfiguration in the
ALTGX_RECONFIG MegaWizard Plug-In Manager. This section contains an estimate
of the logic elements (LE) resources utilized during dynamic reconfiguration.
You can obtain resource utilization for all other PMA controls from the
ALTGX_RECONFIG MegaWizard Plug-In Manager.
For example, the number of LEs used by one dynamic reconfiguration controller is 43
with only tx_vodctrl selected. Similarly, the number of registers is 130.
Figure 2–60 shows the resource utilization in the ALTGX_RECONFIG MegaWizard
Plug-In Manager.
Figure 2–60. Resource Utilization in the ALTGX_RECONFIG MegaWizard Plug-In Manager
HardCopy IV Device Handbook, Volume 3
© June 2009 Altera Corporation