English
Language : 

82583V Datasheet, PDF (93/374 Pages) Intel Corporation – Intel® 82583V GbE Controller
Interconnects—82583V GbE Controller
6.1.6.1.2
6.1.6.1.3
6.1.7
6.1.7.1
6.1.7.2
Table 32.
Error Pollution
Error pollution can occur if error conditions for a given transaction are not isolated to
the error's first occurrence. If the PHY detects and reports a receiver error, to avoid
having this error propagate and cause subsequent errors at upper layers, the same
packet is not signaled at the data link or transaction layers.
Similarly, when the data link layer detects an error, subsequent errors that occur for the
same packet is not signaled at the transaction layer.
Completion With Unsuccessful Completion Status
A completion with unsuccessful completion status is dropped and not delivered to its
destination. The request that corresponds to the unsuccessful completion is retried by
sending a new request for the undeliverable data.
Link Layer
ACK/NAK Scheme
The 82583V supports two alternative schemes for ACK/NAK rate:
1. ACK/NAK is scheduled for transmission following any TLP.
2. ACK/NAK is scheduled for transmission according to timeouts specified in the PCIe
specification.
The PCIe Error Recovery bit, loaded from NVM, determines which of the two schemes is
used.
Supported DLLPs
The following DLLPs are supported by the 82583V as a receiver:
DLLPs Received by The 82583V
Remarks
ACK
NAK
PM_Request_Ack
InitFC1-P
InitFC1-NP
InitFC1-Cpl
InitFC2-P
InitFC2-NP
InitFC2-Cpl
UpdateFC-P
UpdateFC-NP
UpdateFC-Cpl
Remarks
v2v1v0 = 000
v2v1v0 = 000
v2v1v0 = 000
v2v1v0 = 000
v2v1v0 = 000
v2v1v0 = 000
v2v1v0 = 000
v2v1v0 = 000
v2v1v0 = 000
The following DLLPs are supported by the 82583V as a transmitter:
93