English
Language : 

TC1130 Datasheet, PDF (73/113 Pages) Infineon Technologies AG – 32-Bit Single-Chip Microcontroller
TC1130
Power Sequencing
During Power-Up reset pin PORST has to be held active until both power supply
voltages have reached at least their minimum values.
During the Power-Up time (rising of the supply voltages from 0 to their regular operating
values) it has to be ensured, that the core VDD power supply reaches its operating value
first, and then the GPIO VDDP power supply. During the rising time of the core voltage it
must be ensured that 0< VDD-VDDP <0.5 V.
During power-down, the core and GPIO power supplies VDD and VDDP respectively,
have to be switched off completely until all capacitances are discharged to zero, before
the next power-up.
Note: The state of the pins are undefined when only the port voltage VDDP is switched
on.
Data Sheet
69
V0.3, 2003-09