English
Language : 

S9407-AB-HBK-010 Datasheet, PDF (127/276 Pages) Glenair, Inc. – HANDBOOK OF SHIPBOARD ELECTROMAGNETIC SHIELDING PRACTICES
S9407-AB-HBK-010, Rev. 2
6.8.1
Procedure 1 - Determining Cable-to-Cable Spacing and Shielding for
Radiators Versus Susceptors in Susceptor Categories S1, S2, and S4 (Continued)
STEP NO.
DETERMINE THE FOLLOWING
VALUES
Repeated S(dB) = S(dB) susceptor +
step 5
S(dB) radiator
Repeated V3(dBV)
step 6
INFORMATION SOURCE OF
INSTRUCTION
S(dB) susceptor from first step 5.
S(dB) radiator from figure 6-7.
(See paragraph 6.7.2.)
V3(dBV) - V1(dBV) + S(dB) from repeated-step
5.
Repeated New susceptor group number (both
step 7
cables shielded)
Figure 6-5. (See note 4.)
Repeated Spacing requirement with both cables Figure 6-6. Intersection of coordinates
step 8
shielded
determined in step 1 and repeated-step 7.
Repeated Adequate shielding or inadequate
step 9
shielding
If required spacing in repeated-step 8 is less
than or equal to available spacing in step 4,
adequate shielding has been provided.
If required spacing in repeated-step 8 is
greater than available spacing in step 4, the
following solutions apply:
a. Remove physical restrictions to increase
available spacing.
b. Reroute radiator and/or susceptor.
6-14