English
Language : 

PDRP-1001 Datasheet, PDF (15/56 Pages) Systemsensor advanced ideas. – Deluge - Preaction Control Panel
Installing Optional Voltmeter/Ammeter
2. Installation
Installing Optional Voltmeter/Ammeter
To monitor battery voltage and battery charging current, a 4XMM Meter Module is required. To install
the power meter module follow the steps below:
Step Action
1 Cut the jumper wire labeled “AMP”.
2 Secure the module to the backbox with the hardware provided. Refer to
Product Installation Drawing (PID) for detailed instructions.
3 Connect meter cable P2 to connector J2 on the main circuit board.
4 Connect meter cable P3 to connector J3 on the main circuit board.
The figure below shows the mounting location and connections for the Voltmeter/Ammeter.
‘AMP’ Jumper
TB5
J2
AMP
J9
J3
10 20
0
30
DC VOLTS
0
3
3
DC AMPERES
Figure 3 Mounting and Connecting the Meters
PDRP-1001 Instruction Manual PN 50734:D0 04/06/01
15