ISL78223
When the upper switches toggle, the primary current that was
flowing through UL must find an alternate path. It
charges/discharges the parasitic capacitance of switches UL and
LL until the body diode of LL is forward biased. If RESDEL is set
properly, switch LL will be turned on at this time. The output
inductor does not assist this transition. It is purely a resonant
transition driven by the leakage inductance.
VIN+
UL
IP
LL
UR
LL
LR
D1
IS
D2
VOUT+
RTN
VIN-
FIGURE 18. UPPER SWITCH TOGGLE AND RESONANT TRANSITION
The second power transfer period commences when switch LL
closes. With switches UR and LL on, the primary and secondary
currents flow as indicated in Figure 19.
VIN+
UL
UR
D1
LL
VOUT+
RTN
LL
LR
D2
VIN-
FIGURE 19. UR - LL POWER TRANSFER CYCLE
The UR - LL power transfer period terminates when switch LL
turns off as determined by the PWM. The current flowing in the
primary must find an alternate path. The current flows into the
parasitic switch capacitance which charges the node to VIN and
then forward biases the body diode of upper switch UL. As before,
the output inductor current assists in this transition. The primary
leakage inductance, LL, maintains the current, which now
circulates around the path of switch UR, the transformer primary,
and switch UL. When switch LL opens, the output inductor current
free-wheels predominantly through diode D1. Diode D2 may
actually conduct very little or none of the free-wheeling current,
depending on circuit parasitics. This condition persists through
the remainder of the half-cycle.
VIN+
UL
IP
LL
UR
LL
LR
D1
IS
D2
VOUT+
RTN
VIN-
FIGURE 20. UR - UL FREE-WHEELING PERIOD
When the upper switches toggle, the primary current that was
flowing through UR must find an alternate path. It
charges/discharges the parasitic capacitance of switches UR
and LR until the body diode of LR is forward biased. If RESDEL is
set properly, switch LR will be turned on at this time.
VIN+
UL
IP
LL
UR
LL
LR
D1
IS
D2
VOUT+
RTN
VIN-
FIGURE 21. UPPER SWITCH TOGGLE AND RESONANT TRANSITION
The first power transfer period commences when switch LR
closes and the cycle repeats. The ZVS transition requires that the
leakage inductance has sufficient energy stored to fully charge
the parasitic capacitances. Since the energy stored is
proportional to the square of the current (1/2 LLIP2), the ZVS
resonant transition is load dependent. If the leakage inductance
is not able to store sufficient energy for ZVS, a discrete inductor
may be added in series with the transformer primary.
Synchronous Rectifier Outputs and Control
The ISL78223 provides double-ended PWM outputs, OUTLL and
OUTLR, and synchronous rectifier (SR) outputs, OUTLLN and
OUTLRN. The SR outputs are the complements of the PWM
outputs. It should be noted that the complemented outputs are
used in conjunction with the opposite PWM output, i.e., OUTLL
and OUTLRN are paired together and OUTLR and OUTLLN are
paired together.
17