|
GXB2000 Datasheet, PDF (6/60 Pages) Sony Corporation – 16-Channel GPS Receiver Module | |||
|
◁ |
GXB2000
Reception Unit Initialization and Operation
The GXB2000 operation is started by setting the reset input signal RESET (Pin 2) for the reception unit
initialization to high level. The timing should satisfy the conditions noted below.
During Power-on (power-on reset)
VDD = 3.0 to 3.6V, VCC = 4.5 to 5.5V, temperature = â40 to +85°C
VDD/VCC
Power
supply
GND
100ms or more
RESET (Pin 2)
VDD or VCC/2
Initialization During Operation
VDD = 3.0 to 3.6V, VCC = 4.5 to 5.5V, temperature = â40 to +85°C
VDD/VCC
Power supply
100µs or more
RESET (Pin 2)
VDD or VCC/2
GND
â6â
|
▷ |