English
Language : 

705-5100-110 Datasheet, PDF (5/68 Pages) Magnetrol International, Inc. – Enhanced Model 705
x
|
{
x
y
1.1.2 Configuration Information
Some key information is needed to configure the
Eclipse transmitter. Complete the following operating
parameters table before beginning configuration.
Display
Probe Model
Question
What probe model is listed on the
model information?
(first four digits of probe model number)
Answer
_____________
Probe Mount Is the probe mounted NPT, BSP,
or flange?
_____________
Measurement What is the desired measurement? Choices
Type
are: Level only, volume, interface level
or interface level and volume.
_____________
Level Units
What units of measurement will be
used? (inches, centimeters, feet or meters)
(AI block parameter. Not selectable at
transmitter on Model 705 Fieldbus)
_____________
Probe Length What probe length is listed on the
model information?
_____________
Level Offset The desired level reading when the
liquid is at the end of the probe.
_____________
Dielectric
What is the dielectric constant range
of the process medium? (Upper layer
dielectric for interface applications)
_____________
}
Loop Control Is the output current to be controlled
by level or volume?
_____________
Set 4.0 mA
What is the 0% reference point for the
4.0 mA value? (EU_0 value for
FOUNDATION Fieldbus)
_____________
~
Set 20.0 mA What is the 100% reference point for
the 20.0 mA value? (EU_100 value for
FOUNDATION Fieldbus)
_____________
(Top 6" (152 mm) of Single Rod probes is within
z
Blocking Distance)
1.2 QuickStart Mounting
NOTE: Confirm the configuration style and process connection
size/type of the Eclipse transmitter. Ensure it matches the
requirements of the installation before continuing with the
QuickStart installation.
x Confirm the model and serial numbers on the nameplates
of the Eclipse probe and transmitter are identical.
NOTE: For applications using the Model 7xS steam probe, it is manda-
tory to keep the transmitter and probe matched as a set.
1.2.1 Probe
y Carefully place the probe into the vessel. Align the probe
process connection with the threaded or flanged mounting
on the vessel.
57-600 Eclipse Guided Wave Radar Transmitter
5