10 Dielectric Strength, Isolation, Leakage Current
The output is floating and has no ohmic connection to the ground.
The following type and factory tests are conducted by the manufacturer. The test duration is 60s
for type tests and 5s for the factory tests.
Type- & Factory Tests
Input
Output
PE
Output
2.5kVac
PE
2.5kVac
2.5kVac
Signal Pins
3.0kVac
3.0kVac
500Vac
Field tests may be conducted in the field using the appropriate test equipment which applies the
voltage with a slow ramp (2s up and 2s down). Prior to the field test, special treatment of the
unit may be necessary. Connect all input-terminals together as well as all output poles before
conducting the test. When testing, set the cut-off current settings of the test equipment to a
value larger or equal than 10mA. Optionally, a DC test voltage can be applied too. In such
cases, multiply the AC test voltages with the factor 1.41.
The test duration for field tests should not exceed 10s, since every high-pot test adds
extraordinary stress to the unit.
Field Tests
Input
Output
PE
Output
2kVac
PE
2kVac
2kVac
Signal Pins
2.5kVac
2.5kVac
500Vac
Isolation resistance
Leakage Current:
Input to output: 200MOhm (measured with 500Vdc)
Input to PE (earth): 200MOhm (measured with 500Vdc)
Output to PE (earth): 100MOhm (measured with 500Vdc)
max. 1.5mA (measured one minute after turning on the unit)
This document is proprietary. Any dispatch or disclosure of content is authorized only after written authorization by PULS GmbH.
All parameters are specified at 400V, 2.5A, 230Vac, 25°C ambient and after a 5 minutes run-in time unless otherwise noted.
Specification: SP-PAS395 Rev: 3.1
Date: 2013/01/19
9-14