English
Language : 

408-9393 Datasheet, PDF (5/6 Pages) TE Connectivity Ltd – Pneumatic Power
408-9393
3. Insert an unstripped wire into the funnel area between the contact and the wire inserter until it bottoms
on the tool base.
4. Depress the footswitch and hold it until the wire inserter bottoms.
5. Release the footswitch. The wire inserter will retract and the feed slide will automatically advance the
connector to the next contact position.
6. Repeat steps 2 through 5 until all contacts have been terminated.
7. Inspect each termination.
6. MAINTENANCE AND INSPECTION
DANGER
To avoid personal injury, always disconnect the power bench assembly from the air supply when performing maintenance or
inspection procedures.
These procedures have been established to ensure the quality and reliability of the power bench assembly. A
brief inspection should be made daily by the operator and a more detailed inspection should be performed on a
scheduled basis by quality control personnel.
6.1. Daily Maintenance
Each operator of the unit should be made aware of, and responsible for, the following procedures:
1. Remove dust, moisture, and other contaminants with a clean, soft brush, or clean, lint-free cloth.
Do not use objects that could damage the power bench assembly.
2. Ensure that all components are in place and properly secured.
3. With the terminating head or feed track assembly in place, connect the air supply and actuate the
power assembly by depressing and releasing the foot switch to ensure that the mechanisms and
plunger move smoothly and freely.
6.2. Periodic Inspection (At Least Once a Month)
Regular inspections should be performed by quality control personnel. A record of quality control inspections
should remain with the power bench assembly or with personnel responsible for the assembly. It is
recommended that one inspection per month be performed; however, operator training and skill, amount of use,
working conditions, and established company standards are all factors to be considered in scheduling
inspections.
The inspections should be performed in the following sequence:
1. Remove any accumulated film with a suitable cleaning agent that will not affect plastic material.
2. Make certain that all components are in place and properly secured. Check air tube fittings for leaks.
3. Make a few test terminations and inspect the terminations in accordance with the inspection
procedure described in the instructions packaged with the terminating head or feed track assembly.
4. Check for chipped, cracked, worn, or broken areas. If damage is evident, repair is necessary. See
Section 8, Replacement and Repair.
7. REPLACEMENT AND REPAIR
Customer-replaceable parts are listed in Figure 5. Parts other than those listed should be replaced by TE to
ensure quality and reliability. For customer repair service or to order replacement parts, call 1-800-522-6752, or
fax your purchase order to 717-986-7605, or write to: Customer Service (038-035), Tyco Electronics
Corporation, PO Box 3608, Harrisburg, PA 17105-3608.
CUSTOMER SERVICE (038-035)
TYCO ELECTRONICS CORPORATION
P0 BOX 3608
HARRISBURG, PA 17105-3608
TYCO ELECTRONICS CORPORATION UK LTD
or
BARTON TORS
BIDEFORD
NORTH DEVON, GREAT BRITAIN
Rev F
5 of 6