English
Language : 

408-1602 Datasheet, PDF (3/11 Pages) TE Connectivity Ltd – For information on tool setup and operation, refer to Instruction Sheet
408-1602
4. Loosen setscrew on ram and insert shank of moving die into the ram well. Ensure that moving die is
correctly oriented with regard to stationary die, and tighten setscrew on ram (see Figure 2).
CAUTION
The shanks are offset on dual-crimp die assemblies. Take care to ensure that the shank of each die is offset to the same side
to maintain proper mating of dies.
5. Activate the power unit to complete the cycle, and allow the ram to return to the retracted position.
3.2. Die Removal
1. Loosen the lock screw in the top of the crimping head and remove the stationary die.
2. Advance the ram until the setscrew is visible. Loosen the setscrew and remove the moving die.
3. If no die assembly is to be installed following die removal, ensure that the ram setscrew is turned in far
enough to avoid interfering with the movement of the ram.
4. CRIMPING PROCEDURE
4.1. Wire Preparation
Strip the wire as shown in Figure 3; taking care not to nick or cut conductor strands.
NOTE
DO NOT scale from this illustration.
Rev C
Figure 3
3 of 11