English
Language : 

S-24CS16A Datasheet, PDF (23/53 Pages) Seiko Instruments Inc – 2-WIRE CMOS SERIAL E2PROM
Rev.4.3_00
2-WIRE CMOS SERIAL E2PROM
S-24CS16A
4. Acknowledge check
The I2C-bus protocol includes an acknowledge check function as a handshake function to prevent a communication
error. This function allows detection of a communication failure during data communication between the
microprocessor and E2PROM. This function is effective to prevent malfunction, so it is recommended to perform an
acknowledge check on the microprocessor side.
5. Built-in power-on-clear circuit
E2PROMs have a built-in power-on-clear circuit that initializes the E2PROM. Unsuccessful initialization may cause a
malfunction. For the power-on-clear circuit to operate normally, the following conditions must be satisfied for raising
the power supply voltage.
5. 1 Raising power supply voltage
Raise the power supply voltage, starting at 0.2 V maximum, so that the voltage reaches the power supply voltage to
be used within the time defined by tRISE as shown in Figure 28.
For example, when the power supply voltage to be used is 5.0 V, tRISE is 200 ms as shown in Figure 29. The power
supply voltage must be raised within 200 ms.
tRISE (Max.)
Power supply voltage (VCC)
VINIT (Max.)
0.2 V
0 V*1
tINIT*2 (Max.)
*1. 0 V means there is no difference in potential between the VCC pin and the GND pin of the E2PROM.
*2. tINIT is the time required to initialize the E2PROM. No instructions are accepted during this time.
Figure 28 Raising Power Supply Voltage
Seiko Instruments Inc.
23