English
Language : 

FH12-6S-0.5SH Datasheet, PDF (6/19 Pages) Hirose Electric – 0.5mm and 1mm Pitch Connectors For FPC/FFC
qVertical Mounting Type
Operation
1. FPC/FFC Termination procedure.
Connector installed on the board.
1) Verify that the actuator is positioned upright. If the
actuator has rotated to the side, carefully rotate it
upright.
Actuator upright
Precautions
1) Avoid forcing the actuator up or down without the
FPC/FFC inserted.
2) Insert the FPC/FFC vertically in the connector slot
assuring that the conductive traces of the
FPC/FFC are facing away from the actuator.
Stiffener
FPC/FFC conductive traces
Slot
3) Press down the actuator in the direction shown.
2. FPC/FFC Removal
Rotate the actuator upward and withdraw the
FPC/FFC.
11