English
Language : 

Q2406 Datasheet, PDF (40/81 Pages) List of Unclassifed Manufacturers – SELF CONTAINED E GSM/GPRS 900/1800 OR 850/1900 BI BAND MODULE
WM_PRJ_Q2400_PTS_002 - 002
24th January 2003
2.14.1 Operating sequences
2.14.1.1 Power ON
Once the module supplied, the application must set the ON/OFF signal to high
to start the module power ON sequence. The ON/OFF signal must be hold for
1000ms minimum. After this time, an internal mechanism keeps it on hold.
During the power ON sequence, an internal reset is automatically performed by
the module for 240ms (typical). During this phase, any external reset should be
avoided. Once the initialisation is complete (timing is SIM and network
dependent) the AT interface answers « OK » to the application3. For further
details, please check the AT commands manual (+WIND, +WAIP)
POWER SUPPLY
ON/OFF
Ton/off-hold
(1000ms min)
INTERNAL RST
STATE OF THE MODULE
Module OFF
IBB+RF < 10µA
Trst
(240ms typ)
RESET mode
IBB+RF=20 to 40mA
AT answers « OK »
Module ON
IBB+RF<120mA
(no loc. update)
Module READY
SIM and Network dependent
IBB+RF = overall current consumption (Base Band + RF part)
Figure 10 : Power-ON sequence (no PIN code activated)
3 For this, the application has to send AT↵. If the application manages hardware flow control, the
AT command can be sent during the initialisation phase. Another solution is to use the +WIND
command to get an unsolicited status from the module.
confidential ©
Page : 40 / 81
This document is the sole and exclusive property of WAVECOM. Not to be distributed or divulged
without prior written agreement.
Ce document est la propriété exclusive de WAVECOM. Il ne peut être communiqué ou divulgué à
des tiers sans son autorisation préalable.