English
Language : 

108-2411 Datasheet, PDF (5/6 Pages) TE Connectivity Ltd – MEZALOK* Stacking Connector System
108-2411
4.
QUALITY ASSURANCE PROVISIONS
4.1. Qualification Testing
A. Specimen Selection
Specimens shall be prepared in accordance with applicable Instruction Sheets and shall be
selected at random from current production. Test groups 1, 2 and 3 shall consist of a minimum of
4 specimens each. Test groups 4 and 5 shall consist of a minimum of 3 specimens each.
B. Test Sequence
Qualification inspection shall be verified by testing specimens as specified in Figure 2.
4.2. Requalification Testing
If changes significantly affecting form, fit or function are made to the product or manufacturing process,
product assurance shall coordinate requalification testing, consisting of all or part of the original testing
sequence as determined by development/product, quality and reliability engineering.
4.3. Acceptance
Acceptance is based on verification that the product meets the requirements of Figure 1. Failures
attributed to equipment, test setup or operator deficiencies shall not disqualify the product. If product
failure occurs, corrective action shall be taken and specimens resubmitted for qualification. Testing to
confirm corrective action is required before resubmittal.
4.4. Quality Conformance Inspection
The applicable quality inspection plan shall specify the sampling acceptable quality level to be used.
Dimensional and functional requirements shall be in accordance with the applicable product drawing
and this specification.
Rev D
5 of 6