English
Language : 

408-10261 Datasheet, PDF (3/4 Pages) TE Connectivity Ltd – Small Form- Factor Pluggable (SFP)+ Seating
408- 10261
3. Place the connector and cage assembly on the
pc board so that the contacts and alignment posts
are aligned and started into the matching holes in
the pc board.
4. Center the seating tool (with the connector and
cage assembly) under the ram of the application
tool. Slowly lower the ram until it just meets the
seating tool. Verify alignment of pc board support,
pc board, connector and cage assembly, and
seating tool.
CAUTION
!
Damage to the pc board, seating tool, or
connector and cage assembly may occur if the
seating tool is not properly seated on the
connector and cage assembly before cycling the
application tool.
5. Cycle the application tool to seat the connector
and cage assembly on the pc board. Then retract
the ram, and carefully remove the seating tool by
pulling it straight from the cage assembly.
6. Remove the wall support from the cage
assembly.
7. Check the connector and cage assembly for
proper seating according to the following:
a. the widest section of each compliant pin is
inside its intended pc board hole
b. each alignment post is in its intended pc
board hole
c. the connector and cage assembly is seated
on the pc board with a seating height—
measured from the top of the cage assembly
(not including the springs or elastomeric gasket)
to the top of the pc board— given in Figure 2
d. if present, the gap between the standoffs and
the pc board is no more than 0.10 mm [.004 in.]
NOTE
i
For detailed application requirements of the
connector and cage assembly, refer to the
relative application specification.
6.1. Daily Maintenance
It is recommended that each operator be made aware
of, and responsible for, the following steps of daily
maintenance.
1. Remove dust, moisture, and contaminants with
a clean, soft brush or a lint--free cloth. DO NOT
use objects that could damage the components.
2. When the seating tool and wall support are not
in use, store them in a clean, dry area.
6.2. Periodic Inspection
Regular inspections should be performed by quality
control personnel. A record of scheduled inspections
should remain with the seating tool or be supplied to
personnel responsible for the seating tool kit.
Inspection frequency should be based on amount of
use, working conditions, operator training and skill,
and established standards.
7. REPLACEMENT AND REPAIR
Customer--replaceable parts are listed in Figure 3.
A complete inventory should be stocked and
controlled to prevent lost time when replacement of
parts is necessary. Parts other than those listed
should be replaced by TE Connectivity to ensure
quality and reliability. Order replacement parts
through your representative, or call 1--800--526--5142,
or send a facsimile of your purchase order to
717--986--7605, or write to:
CUSTOMER SERVICE (038--035)
TYCO ELECTRONICS CORPORATION
PO BOX 3608
HARRISBURG PA 17105--3608
8. REVISION SUMMARY
S Updated document to corporate requirements
S Added new part numbers to tables in Figures 1
and 3
6. MAINTENANCE AND INSPECTION
The seating tool is assembled and inspected before
shipment. It is recommended that the seating tool be
inspected immediately upon arrival at your facility to
ensure that it has not been damaged during
shipment, and that it conforms to the dimensions
provided in Figure 3.
Rev C
3 of 4