English
Language : 

408-32163 Datasheet, PDF (2/4 Pages) TE Connectivity Ltd – Enhanced Small Form-Factor
408-32163
During extraction, the back and sides of the extraction tool protect the cage assembly from damage, the wall
supports support the individual ports of the cage assembly, and the top push plate provides a surface to apply
an even force to extract the pc board from the connector and cage assembly.
3. APPLICATION TOOLING REQUIREMENT
Power for the extraction tool must be provided by application tools (with a ram) capable of supplying a
downward force of 44.5 N [10 lb] per contact.
Manual Arbor Frame Assembly 58024-1 is available for use with these extraction tool kits. Refer to Instruction
Sheet 408-6923 for operating procedure.
CAUTION
Over-driving of the extraction tool could cause damage to the connector or cage assembly.
4. EXTRACTION PROCEDURE
1. Ensure that the amount of wall supports installed onto the finger mounting block matches the amount
of ports of the cage assembly. It is recommended to center the group of wall supports on the finger
mounting block. Refer to Figure 1.
2. Install the top push plate onto the upper tooling and the base plate (with the wall supports) onto the
lower tooling of the application tool. See Figure 2.
CAUTION
Ensure that the upper tooling and lower tooling are secure; otherwise, damage to the connector and cage assembly could
occur.
3. Place the open end of the extraction tool over the cage assembly so that the cutouts align with the
protruding part (at the back) of the cage assembly. Make sure that the sides of the extraction tool sit
on the pc board.
4. Slide the extraction tool (with the connector and cage assembly and pc board) onto the wall supports
so that each “finger” of each wall support enters a port of the cage assembly. Make sure the fingers
are fully inserted into the ports. See Figure 2.
Side View
Top Push Plate
Sides of Extraction Tool
Sitting on PC Board
Application Tool Ram
Fingers of Wall
Supports Fully
Inserted into
Cage Assembly
PC Board
Lower Tooling of
Application Tooling
Base Plate (with
Wall Supports)
Figure 2
5. Cycle the application tool to extract the pc board from the connector and cage assembly. Then retract
the ram, and carefully remove the extraction tool (with the connector and cage assembly) from the
wall supports.
5. MAINTENANCE AND INSPECTION
The extraction tool kit is inspected before shipment. It is recommended that the extraction tool kit be inspected
immediately upon arrival at your facility to ensure that it has not been damaged during shipment and that it
conforms to the dimensions provided in Figure 3.
Rev A
2 of 4