English
Language : 

AN4128 Datasheet, PDF (21/28 Pages) STMicroelectronics – This document describes the STEVAL-SPBT4ATV3 demonstration board
AN4128
Figure 30. Automatic connection dongle1, dongle2
Getting started
6.2.3
● Delete smart cable setup:
The command to remove the SmartCableSetup is:
– AT+AB DeleteSmartCable
if the operation is successful, the answer is:
– AT-AB DeleteSmartCableDone
To give the command the dongle must be in; -CommandMode-.
● Erase bond table:
The erase bond table command must be used to clear all the bonded device entries:
– AT+AB EraseBondTable
if the operation is successful, the answer is:
– AT-AB BondTableErased
Command and answer syntax
The syntax of the commands is fixed and cannot be changed, the prefix for each command
is AT+AB.
Each command has an answer which is preceded by the prefix AT-AB; this identifier can be
changed by means of the AT+AB config command.
If it is necessary to change the prefix of the answer from AT-AB to “>>” on dongle1, the steps
to follow are shown in Figure 31:
Doc ID 023306 Rev 1
21/28