7.5 Transformer Construction
1/2 Primary
Basic Insulation
Bifilar Bias
Winding
Basic Insulation
30 V Quad filar
Secondary
Winding
Basic Insulation
Shield
Basic Insulation
1/2 Primary
Finish Wrap
Final Assembly
Start at Pin 2. Wind 20 bifilar turns of item [3] in
approximately 1.25 layer, finish on Pin 3.
Use one layer of item [5] for basic insulation.
Starting at Pin 5, wind 5 bifilar turns of item [3]. Spread turns
evenly across bobbin. Finish at Pin 4.
Use two layers of item [5] for basic insulation.
Start at Pins 9 and 10. Wind 10 quad filar turns of item [4]
(about 2 layers). Spread turns evenly across bobbin. Finish
on Pins 7 and 8.
Use two layers of item [5] for basic insulation.
Starting at Pin 1, wind 7 bifilar turns of item [3]. Spread turns
evenly across bobbin. Leave 1/2-inch of flying lead at finish.
Use two layers of item [5] for basic insulation. Trap flying lead
from shield winding between tape layers.
Start at Pin 3. Wind 19 bifilar turns of item [3] in
approximately 1 layer, finish on Pin 1.
Use three layers of item [5] for finish wrap.
Assemble and secure core halves. Dip Varnish (item [6]).