English
Language : 

W2308EP Datasheet, PDF (14/26 Pages) Keysight Technologies – Quick Start for Signal Integrity
Determine Eye Diagram Performance for PCI Express Gen 2 (continued)
Create the parallel R, parallel C Load termination using
the ideal R
and ideal C
components in the
Lumped-Components Palette and the Insert Ground
icon in the Schematic Toolbar.
TIP:
Use the Tool Bar rotate icon
and the mirror
icon
to create the parallel topology. Notice that
typical keyboard combinations CTRL-c and CTRL-v work
for copying and pasting items selected with the Tool Bar
arrow icon
and clicking and dragging the selection
box around items in the schematic.
To change the capacitor value click on the value and then
when the value is highlighted for editing type in the new
value 0.02.
Add Source terminations to two of the ports and Load
terminations to the remaining 6 ports.
The component values are R= 50 Ω for the resistors, and
C=0.02 pF for the capacitors.
Source
Load
Load
Load
14