English
Language : 

ICE3B0365L Datasheet, PDF (8/28 Pages) Infineon Technologies AG – Off-Line SMPS Current Mode Controller with integrated 650V Startup Cell/Depletion CoolMOS™ and Latched off Mode
CoolSET™-F3
ICE3xxx65L
Functional Description
The maximum current consumption before the
controller is activated is about 160µA.
When VVCC falls below the off-threshold VCCoff=8.5V the
internal reference is switched off and the Power Down
reset let T1 discharging the soft-start capacitor CSoftS at
pin SoftS. Thus it is ensured that at every startup cycle
the voltage ramp at pin SoftS starts at zero.
The internal Voltage Reference is switched off if
Latched Off Mode or Auto Restart Mode is entered.
The current consumption is then reduced to 300µA.
Once the malfunction condition is removed, this block
will then turn back on. The recovery from Auto Restart
Mode does not require disconnecting the SMPS from
the AC line. In case Latched Off Mode is entered, VCC
needs to be lowered below 6V to reset the Latched Off
Mode. This is done usually by disconnecting the SMPS
from the AC line.
When Active Burst Mode is entered the internal Bias is
switched off in order to reduce the current consumption
below 1.05mA while keeping the Voltage Reference
still active as this is necessary in this mode.
3.3
Startup Phase
signal VSoftS which is generated by the external
capacitor CSofts in combination with the internal pull up
resistor RSoftS, determines the duty cycle until VSoftS
exceeds 4V.
When the Soft Start begins, CSoftS is immediately
charged up to approx. 1V by T2. Therefore the Soft
Start Phase takes place between 1V and 4V. Above
VSoftsS = 4V there is no longer duty cycle limitation
DCmax which is controlled by comparator C7 since
comparator C2 blocks the gate G7 (see Figure 4). This
maximum charge current in the very first stage when
VSoftS is below 1V, is limited to 1.30mA.
VSoftS
5.4V
4V
max. Startup Phase
1V
max. Soft Start Phase
6.5V
DCmax
t
3.25k
SoftS
RSoftS
T2
T3
1V
CSoftS
Soft Start
C7
Soft-Start
Comparator
&
G7
Gate Driver
C2
4V
0.85V
x3.7
CS
PWM OP
DC1
DC2
t1
t2 t
Figure 5 Startup Phase
By means of this extra charge stage, there is no delay
in the beginning of the Startup Phase when there is still
no switching. Furthermore Soft Start is finished at 4V to
have faster the maximum power capability. The duty
cycles DC1 and DC2 are depending on the mains and
the primary inductance of the transformer. The
limitation of the primary current by DC2 is related to
VSoftS = 4V. But DC1 is related to a maximum primary
current which is limited by the internal Current Limiting
with CS = 1V. Therefore the maximum Startup Phase
is divided into a Soft Start Phase until t1 and a phase
from t1 until t2 where maximum power is provided if
demanded by the FB signal.
Figure 4 Soft Start
At the beginning of the Startup Phase, the IC provides
a Soft Start duration whereby it controls the maximum
primary current by means of a duty cycle limitation. A
Version 2.0
8
8 May 2006