English
Language : 

ICE3B0365J Datasheet, PDF (8/26 Pages) Infineon Technologies AG – Off-Line SMPS Current Mode Controller with integrated 650V Startup Cell/Depletion CoolMOS™
CoolSET™-F3
ICE3Bxx65J
When VVCC falls below the off-threshold VCCoff=10.3V
the bias circuit is switched off and the Power Down
reset let T1 discharging the soft-start capacitor CSoftS at
pin SoftS. Thus it is ensured that at every startup cycle
the voltage ramp at pin SoftS starts at zero.
The bias circuit is switched off if Auto Restart Mode is
entered. The current consumption is then reduced to
300uA.
Once the malfunction condition is removed, this block
will then turn back on. The recovery from Auto Restart
Mode does not require disconnecting the SMPS from
the AC line.
When Active Burst Mode is entered, some internal Bias
is switched off in order to reduce the current
consumption to about 500uA while keeping a
comparator (which trigger if VFB has exceeded 3.61V)
and the Soft Start capacitor clamped at 3.0 V as this is
necessary in this mode.
resistor RSoftS determines the duty cycle until VSoftS
exceeds 3.1V.
When the Soft Start begins, CSoftS is immediately
charged up to approx. 0.8V by T2. Therefore the Soft
Start Phase takes place between 0.8V and 3.1V.
Above VSoftsS = 3.1V there is no longer duty cycle
limitation DCmax which is controlled by comparator C7
since comparator C2 blocks the gate G7 (see Figure
5).This maximum charge current in the very first stage
when VSoftS is below 0.8V, is limited to 0.9mA.
VSoftS
4.0V
3.1V
max. Startup Phase
3.3
Startup Phase
0.8V
max. Soft Start Phase
3.25kΩ
5V
RSoftS
SoftS
CSoftS
Freq Jitter
Charging
current IFJ
Freq Jitter
Discharging
current IFJ
T2
T3
0.8V
Freq Jitter
Control
Soft Start
C7
Soft-Start
Comparator
&
G7
Gate Driver
C2
3.1V
0.6V
PWM OP
x3.2
CS
DCmax
t
DC1
DC2
t1
t2 t
Figure 5 Startup Phase
By means of this extra charge stage, there is no delay
in the beginning of the Startup Phase when there is still
no switching. Furthermore Soft Start is finished at 3.1V
to have faster the maximum power capability. The duty
cycles DC1 and DC2 are depending on the mains and
the primary inductance of the transformer. The
limitation of the primary current by DC2 is related to
VSoftS = 3.1V. But DC1 is related to a maximum primary
current which is limited by the internal Current Limiting
with CS = 1V. Therefore the maximum Startup Phase
is divided into a Soft Start Phase until t1 and a phase
from t1 until t2 where maximum power is provided if
demanded by the FB signal.
Figure 4 Soft Start
At the beginning of the Startup Phase, the IC provides
a Soft Start duration whereby it controls the maximum
primary current by means of a duty cycle limitation. A
capacitor CSofts in combination with the internal pull up
Version 2.3
8
8 May 2006