English
Language : 

408-32224 Datasheet, PDF (4/4 Pages) TE Connectivity Ltd – Read and understand these instructions before using the removal tools.
408-32224
2. Place the pusher block over the swage block and header.
3. Make sure the washers are on the separation screws and thread the screws into the swage block as
shown in Figure 6.
4. Tighten the separation screws. Tighten the screws at the same rate. Do not tighten one more than half
of a turn before tightening the other by the same amount.
5. When the header is removed from the swage block, loosen the separation screws and place them into
the pusher block as shown in Figure 1.
Separation
Screws
Swage Block
Pusher Block
Header
Figure 6
4. MAINTENANCE AND INSPECTION
TE Connectivity (TE) recommends that the tool be inspected immediately upon its arrival to ensure that it has
not been damaged during shipment.
4.1. Daily Maintenance
It is recommended that each operator be made aware of, and responsible for, the following steps of daily
maintenance:
 Remove dust, moisture, and other contaminants with a clean, soft brush, or lint-free cloth. DO NOT use
objects that could damage the tool or any of its components.
 When the tool is not in use, store it in a clean, dry area.
4.2. Periodic Inspection
Regular inspections should be performed by quality control personnel. A record of scheduled inspections
should remain with the tool or be supplied to personnel responsible for the tool. The inspection frequency
should be based on the amount of use, working conditions, operator training and skill, and established
company standards.
5. REPLACEMENT AND REPAIR
Parts should be replaced by TE to ensure quality and reliability. For customer repair service or to order
replacement parts, call 1-800-522-6752, or fax your purchase order to 717-986-7605, or write to: Customer
Service (038-035), Tyco Electronics Corporation, PO Box 3608, Harrisburg, PA 17105-3608.
6. REVISION SUMMARY
 Initial release of document
Rev A
4 of 4