English
Language : 

S-7750C Datasheet, PDF (26/44 Pages) Seiko Instruments Inc – PROGRAMMABLE PORT CONTROLLER (PORT EXPANDER WITH BUILT-IN E2PROM CIRCUIT)
PROGRAMMABLE PORT CONTROLLER (PORT EXPANDER WITH BUILT-IN E2PROM CIRCUIT)
S-7750C
Rev.1.1_00
3. Acknowledgment check
The I2C-bus protocol includes an acknowledgment check function as a handshake function to prevent a
communication error. This function allows detection of a communication failure during data communication between
the master device and the S-7750C.
4. Power-on-clear circuit
The S-7750C has a power-on-clear circuit that initializes itself at the same time during power-on. Unsuccessful
initialization may cause a malfunction. To operate the power-on-clear circuit normally, the following conditions must be
satisfied to raise the power supply voltage.
4. 1 Raising power supply voltage
As shown in Figure 32, raise the power supply voltage from 0.2 V max., within the time defined as tRISE which is the
time required to reach the power supply voltage to be set.
For example, if the power supply voltage is 3.0 V, tRISE = 100 ms as seen in Figure 33. The power supply voltage
must be raised within 100 ms.
tRISE (Max.)
Power supply voltage (VCCH)
VINIT (Max.) 0.2 V
0 V*1
tINIT*2 (Max.)
*1. 0 V means there is no difference in potential between the VCCH pin and the VSS
pin of the S-7750C.
*2. tINIT is the time required to initialize the S-7750C. No instructions are accepted
during this time.
Figure 32 Raising Power Supply Voltage
26
Seiko Instruments Inc.