English
Language : 

BTS5016-2EKA Datasheet, PDF (32/54 Pages) Infineon Technologies AG – Smart High-Side Power Switch
BTS5016-2EKA
Diagnostic Functions
IIS(FAULT)
IS
RIS
OL
comp.
GND
Vbat
VS
SOL
ROL
OUT
ILOFF
Ileakage
ZGND
VOL(OFF)
RPD
Rleakage
Figure 25 Open Load Detection in OFF Electrical Equivalent Circuit
Open Load in OFF.svg
7.3.3.3 Open Load Diagnostic Timing
Figure 26 shows the timing during either Open load in ON or OFF condition. Please note that a delay tsIS(OT_BLANK)
has to be respected between the falling edge of the input and rising edge of the DEN, when applying an open load
in OFF diagnosis request, otherwise the voltage VOUT cannot be guaranteed and the diagnosis can be wrong.
Load is present
VIN
Open load
VOUT
RDSON x IL
IOUT
t
VOL(OFF )
t
VDEN
IIS
90% of IIIS(FAULT) static
tsIS(LC)
Figure 26 SENSE Signal in Open Load Timing
tsIS ( OT_ BL AN K)
t
t sIS(FAU L T_ OL_ OFF )
t
Error Settling Disabling Time .vsd
Data Sheet
PROFET™+ 12V
32
Rev 1.0, 2013-06-17