|
MB39A113 Datasheet, PDF (23/51 Pages) Fujitsu Component Limited. – ASSP for Power Supply Applications (Secondary Battery) | |||
|
◁ |
MB39A113
s PROCESSING WITHOUT USING OF THE CURRENT AMP1 AND AMP2
When Current Amp is not used, connect the +INC1 terminal (pin 13), +INC2 terminal (pin 24), âINC1 terminal
(pin 12), and âINC2 terminal (pin 1) to VREF, and open the OUTC1 terminal (pin 10) and OUTC2 terminal (pin 2).
⢠Connection when Current Amp is not used
âOpenâ
12 âINC1
1 âINC2
10 OUTC1
2 OUTC2
6 VREF
+INC1 13
+INC2 24
s PROCESSING WITHOUT USING OF THE ERROR AMP1 AND AMP2
When Error Amp is not used, leave the FB12 terminal (pin 7) open and connect the âINE1 terminal (pin 8) and
âINE2 terminal (pin 4) to GND, and connect +INE1 terminal (pin 9) and +INE2 terminal (pin 3) to VREF.
⢠Connection when Error Amp is not used
âOpenâ
9 +INE1
3 +INE2
8 âINE1
4 âINE2
7 FB12
6 VREF
GND 23
23
|
▷ |