English
Language : 

408-4074 Datasheet, PDF (3/5 Pages) TE Connectivity Ltd – Reasons for reissue of this instruction sheet are provided in Section 8, REVISION SUMMARY.
408-4074
Wires Inserted
Into Wire Slot
7. Manually reposition the connector in the
terminating head to the next pair of terminals to be
terminated.
8. Repeat Steps 2 through 7 until all the terminals
have been terminated.
9. Remove connector from the tool.
10. Inspect each termination using the procedure in
Section 5, INSPECTION.
5. INSPECTION
Inspect each termination to ensure it meets the
inspection criteria shown in Figure 5.
Terminals
Aligned With
Wire Slots
Strain Relief
556805-1 (Ref)
Connector
Terminating
Head (Ref)
Figure 4
5. Discard the sheared wires from the terminating
head.
6. Release the cam handle. The inserter will retract.
6. TOOL MAINTENANCE
The procedures that follow have been established to
ensure the quality and reliability of terminating heads.
A brief check should be made daily, and a more
detailed inspection should be scheduled by your
quality control personnel.
6.1. Daily Maintenance
Each operator should be aware of the following:
1. Remove dust moisture, and other contaminats
with a clean brush, or soft, lint-free cloth. Do NOT
use objects that will damage the tool.
2. Make sure all components are in place and
properly secured. Refer to Figure 7.
3. Actuate handle assembly to ensure mechanisms
inside terminating head move smoothly.
Rev B
Figure 5
3 of 5