English
Language : 

PARA-SPL-40WDF-QHA-CW-U Datasheet, PDF (8/9 Pages) PARA LIGHT ELECTRONICS CO., LTD. – LED Projection Lamp
LED Projection Lamp
PARA-SPL-40WDF-QHA-CW-U
Release by
PARA LIGHT DCC
Version: A /0
- Installing and Using:
1. Hold on a lamp arm:(The lamp arm is not including in this product)
Secure lamp head assembly to the end of the lamp arm with 3/8-inch lag bolt.
2. Mounting:
2-1. Select a location (Brick, Block or Concrete wall) and drill three holes, 3/8”
Diameter x 3” Length. Be sure to select the proper holes pattern for the
model being installed. Recommended mounting height is 6-½ feet or higher.
2-2.For solid surfaces: 3/8-inch lag bolts with appropriate expansion anchors are
recommended.
2-3.For hollow walls with no rear access, toggle bolts with expansion wings are
recommended.
2-4. For hollow wall with rear access, use 3/8-inch bolts, washers, lock washers
and nuts.
- Packing Specification
1. Put maximum 4 pieces LED projection lamp into outer carton.
2. Prevent LED projection lamp defect during transportation.
3. Complete the transportation simulation tests (Vibration frequency:10~45Hz / Vibration
test Hz:45Hz / Operation vibration test:3hrs / Shock:3G(x,y), 4G(z) ) and no LED
projection lamp defect happened.
4.Using appropriate dust prevented approach for component and product that no
dust source similar with sediment and unusual glutinous objects.
Doc. No. : DS-80-14-XXXX
Date : 2014/3/20
Page : 8