English
Language : 

MAX17075 Datasheet, PDF (17/22 Pages) Maxim Integrated Products – Boost Regulator with Integrated Charge Pumps, Switch Control, and High-Current Op Amp
Boost Regulator with Integrated Charge Pumps,
Switch Control, and High-Current Op Amp
Reference Voltage (REF)
The reference voltage is nominally 1.25V, and can
source at least 50µA (see the Typical Operating
Characteristics). VCC is the input of the internal refer-
ence block. Bypass REF with a 0.22µF ceramic capaci-
tor connected between REF and AGND.
Power-Up Sequence and Soft-Start
Once the voltage on VCC exceeds the XAO UVLO
threshold of approximately 1.5V, the reference turns on.
With a 0.22µF REF bypass capacitor, the reference
reaches its regulation voltage of 1.25V in approximately
1ms. When the reference voltage exceeds 1V and VCC
exceeds its UVLO threshold of approximately 2.25V,
the IC enables the main step-up regulator, the gate-on
linear-regulator controller, and the gate-off linear-
regulator controller simultaneously.
The IC employs soft-start for each regulator to minimize
inrush current and voltage overshoot and to ensure a
well-defined startup behavior. Each output uses a 7-bit
soft-start DAC. For the step-up and the gate-on linear
regulator, the DAC output is stepped in 128 steps from
zero up to the reference voltage. For the gate-off linear
regulator, the DAC output steps from the reference
down to 250mV in 128 steps. The soft-start duration is
10ms (typ) for step-up regulator and 3ms (typ) for gate-
on and gate-off regulators.
A capacitor (CDEL) from DEL to AGND determines the
switch-control-block startup delay. After the input volt-
age exceeds the UVLO threshold (2.25V typ) and the
soft-start routine for each regulator is complete and
there is no fault detected, a 5mA current source starts
charging CDEL. Once the capacitor voltage exceeds
1.25V (typ), the switch-control block is enabled as
shown in Figure 8. After the switch-control block is
enabled, COM can be connected to SRC or DRN
through the internal p-channel switches, depending
upon the state of CTL. Before startup and when VIN is
less than UVLO, DEL is internally connected to AGND
to discharge CDEL. Select CDEL to set the delay time
using the following equation:
CDEL
=
DELAY _ TIME ×
5µA
1.25V
When the input voltage falls below the UVLO falling
threshold, the controller turns off the main step-up regu-
lator and disables the switch-control block; the opera-
tional amplifier output is high impedance.
Fault Protection
During steady-state operation, if the output of the main
regulator or any of the linear-regulator outputs exceed
their respective fault-detection thresholds, the
MAX17075 activates an internal fault timer. If any condi-
tion or combination of conditions indicates a continuous
fault for the fault-timer duration (50ms typ), the
MAX17075 sets the fault latch to shut down all the out-
puts except the reference. Once the fault condition is
removed, cycle the input voltage (below the UVLO
falling threshold) to clear the fault latch and reactivate
the device. The fault-detection circuit is disabled during
the soft-start time.
2.25V
1.5V
1V
VVCC
VREF
VAVDD
14ms SOFT-START
VCOM
3ms SOFT-START
VPOUT
1.25V
VGOFF
VDEL
Undervoltage Lockout (UVLO)
The UVLO circuit compares the input voltage at VCC
with the UVLO threshold (2.25V rising, 2.20V falling, typ)
SOFT-START BEGINS
VGON
to ensure the input voltage is high enough for reliable
operation. The 50mV (typ) hysteresis prevents supply
transients from causing a restart. Once the input voltage
INPUT
VOLTAGE
SWITCH
CONTROL
exceeds the UVLO rising threshold, startup begins.
OK
ENABLED
Figure 8. Power-Up Sequence
______________________________________________________________________________________ 17