English
Language : 

TR0636E-10026 Datasheet, PDF (4/21 Pages) Hirose Electric – IT3 Thermal Cycling Test Report
IT3 Thermal Cycling Test
3 THERMAL CYCLING TEST PROCEDURE
Jabil
Virgin assembly (5.2)
Test samples (4.5)
Eutectic
X-ray inspection (5.4)
Continuity check (5.5)
Rework (5.3)
Test samples (4.5)
Eutectic
TR0636E-10026
Trace Labs
X-ray inspection (5.4)
Continuity check (5.5)
Two combinations of assembled test samples [1 virgin, 1 reworked]
Thermal cycling test (6)
Thermal cycling test start (6.3)
Monitor the resistance increase
to initial resistance (6.4)
20 % or more increase
to the initial resistance is detected
for five consecutive reading scans
(6.5)
No (Pass)
Yes (Failure):
Five consecutive reading scans or more
Suspend thermal cycling test.
Detect failure points. (6.6)
Rerouting to skip the failure points
with jumper wire (6.7)
Resume Test
Failure points =< 50% (6.5)
YES (Pass)
Test duration (6.8)
3500 cycles
NO (Failure):
More than 50 % of all solder joints
Terminate test
Thermal Cycling
Test Report (9)
Hirose
&
Jabil
Cross Section at BGA joints
Jabil
Solder ball sheer test (7)
Hirose
Solder Ball Sheer
Test Report (10)
Cross Sectioning
Report (11)
-4-