English
Language : 

YOD2B Datasheet, PDF (8/11 Pages) GREATECS – 96RGBx64 (0.95") OLED Switches Snap-In Type
OLED Push Switches
96RGBx64 (0.95”) OLED Switches Snap-In Type
YOD2B
FUNCTION SPECIFICATION
1 Commands
Refer to the Technical Manual for the SSD1331
2 Power Down and Power up Sequence
To protect OEL panel and extend the panel life time, the driver IC power
up/down routine should include a delay period between high voltage and low
voltage power sources during turn on/off. It gives the OEL panel enough time
to complete the action of charge and discharge before/after the operation.
2.1 Power up Sequence
1. Power up VDD
2. Send Display off Command
3. Driver IC initial setting
4. Clear Screen
5. Power up Vcc
6. Delay 100ms (When VDD is stable)
7. Send Display on Command
2.2 Power down Sequence
1. Send Display off command
2. Power down Vcc
3. Delay 100ms (When Vcc is reach 0 and panel is completely discharges)
4. Power down VDD
sales@greatecs.com
www.greatecs.com 8