English
Language : 

AI85014 Datasheet, PDF (1/1 Pages) Glenair, Inc. – Twinax Socket Contact
AI85014
Twinax Socket Contact
Assembly Instructions
Socket Contact
1. Strip cable to dimensions shown.
Be careful not to flare braid open.
2. Pre-tin conductor and braid shield.
B
3. Clean the solder joint with alcohol.
1. Insert cable into socket contact.
Make sure center conductor
lines up to the center socket.
1. Install center conductors until they
bottom-out in the contact cavity.
Inspect to ensure cable shield is visible
through the inspection hole.
2. Apply flux and solder through the
inspection hole; remove residues
and contamination with alcohol after
soldering.
1. Install M23053/5-204 or M23053/6-204
shrink tubing; cover solder area
and extend insulation by minimum
of one wire diameter.
1. Illustrates final assembly.
100 Ohm Parallel Cable
STEP 1
Cable Shield
STEP 2
.280
(7.11)
Dielectric
Conductors
.085 (2.16)
.170 (4.32)
STEP 3
STEP 4
STEP 5
Shrink Tubing
© 2012 Glenair, Inc.
CAGE Code 06324
Printed in U.S.A.
GLENAIR, INC. • 1211 AIR WAY • GLENDALE, CA 91201-2497 • 818-247-6000 • FAX 818-500-9912
www.glenair.com
B-30
E-Mail: sales@glenair.com